Hemeiuș, jud. Bacău (Parc Industrial HIT)
Nr. crt | Client | Date | Activity |
---|---|---|---|
1 | ELECTROCENTRALE BUCURESTI SA
| 2015 | LN4 – Boiler no. 2 – 420 t/h – CTE Progresu – Drum repair |
3 | FAST TECHNICAL ASSISTANCE SRL
| 03.02.2015 | Design and execution of automation installations CET 1 Chimiei |
4
| STRABAG SRL | 24.03.2015 | Installation works for fuel distribution and tanks |
6
| STC S.p.a | 12.02.2016 | Chemical washing for CET Oradea boilers |
7 | AEROSTAR SA | 17.06.2016 | Supply of Wiessman Vitomax 200 6t/h steam boiler and commissioning |
8 | AEROSTAR SA | 14.09.2017 | Supply of ventilation systems – noxious exhaust |
11 | VEOLIA ENERGIE IASI SA
| 19.05.2017 | Dust removal installation repair |
12 | ENERGOMONTAJ SA | 05.07.2018 | Design and execution, repair of steam boiler pressure system subassemblies no. 2, type CR 1244-00 420 t/h |
17 | VEOLIA ENERGIE IASI SA
| 23.07.2019 | Acquisition of pressure system subassemblies |
18 | TURBOENERGY POWER SRL
| 20.06.2019 | Supply of support system elements – CTE Bucharest South |
19 | AEROSTAR SA | 11.06.2019 | Supply of noxious capture and filtration system |
20 | THERMOENERGY GROUP SA | 12.04.2019 | Natural gas supply of cogeneration groups |
21 | RIFIL SA | 21.03.2019 | Cogeneration unit design |
24 | STRABAG SRL | 12.02.2020 | Execution of TRF2 Romgaz-Iernut Cooling Tower installations |
25 | AEROSTAR SA | 13.05.2020 | Execution of storage tanks and pressure vessels |
26 | ELECTROCENTRALE BUCURESTI SA | 18.05.2020 | LN3 – Boiler no. 3 CTE Progresu – Drum repair |
27 | RIKKO STEEL SRL | 24.06.2020 | Rehabilitation of running tracks and installation of overhead cranes |
28 | AEROSTAR SA | 29.04.2020 | Relocation of thermal modules |